国产玖玖/国产91美女视频/欧美一级黄色片/喷潮91/日本一本到道免费一区二区/黄色av免费在线看/乳女教师の诱惑juliamagnet/wwww黄色片/国产黄a三级三级三级看三级男男/亚洲妇女水蜜桃av网网站/欧美精品久久久久性色/无码熟熟妇丰满人妻啪啪/久久婷婷五月综合色99啪/欧美精品一区二区三区免费视频/国产女主播视频/色很久/五月婷香蕉久色在线看/日韩一级成人

+ WeChat:切換按鈕及底部微信

Welcome to the website of Blue One Environmental Protection Technology Co., Ltd!

Contact 13323711188

You Are Here:Home> Product Center >Technical Solution>Industrial wastewater technology scheme
Spray painting wastewater treatment plan

Spray painting wastewater treatment plan

Spray painting wastewater mainly comes from the wastewater generated by the workshop for painting and coloring the items to be painted. Spray paint wastewater is one of the industrial wastewater that is difficult to treat due to its high concentration, large pigment content, diverse types, and low water volume.

    Spray painting wastewater mainly comes from the wastewater generated by the workshop for painting and coloring the items to be painted. Spray paint wastewater is one of the industrial wastewater that is difficult to treat due to its high concentration, large pigment content, diverse types, and low water volume. So, why not treat this difficult spray paint wastewater and let it harm our ecological environment at will? Of course not! When dealing with spray paint wastewater, it is necessary to pay attention to methods and not blindly treat it, otherwise it will backfire. So let Blue One Environmental Protection, who has many years of experience in sewage treatment, explain to us the treatment plan for spray paint wastewater.
    Process diagram of spray painting wastewater

    The production wastewater first enters the grid well, flows automatically to the regulating tank, is pumped into the phenol passivation equipment by the lifting pump, and undergoes drug phenol passivation decomposition treatment. After treatment, the water flows into the A/O secondary biological oxidation tank for deep biochemical treatment to achieve purification effect, and then flows into the sedimentation tank for secondary sedimentation. The clear water after sedimentation flows into the clear water tank through the drainage weir, and is filtered by the multi-media filtration equipment to meet the production reuse standard. The sludge at the bottom of the primary sedimentation tank and sedimentation tank is filtered by a sludge lift pump through a filter press, and the filtered sludge is squeezed into dry cakes for further processing;

  • Telephone:0371-88912366 0371-88912399

  • Service Hotline:4006096637(technology)

  • Address:Building 3, Dingxiang County, High tech Industrial Development Zone, Zhengzhou City, Henan Province

  • Add WeChat

Copyright Notice: The content published on this website may not be downloaded, reproduced or mirrored without the permission of this website and the author. Violators will be held legally responsible by this website.